Tuesday, February 1, 2011

Spanish Vintage Wedding Reception

Boring news about the atom

Well that our nuclear engineers have done in the past year and plan for the future.

volume of uranium production for 2010 totaled 17,803 tons, almost 30% higher than in 2009. At the same time period 2009-2010. amount of uranium mining in Kazakhstan increased by 2 times.
sales volume of uranium JSC Kazatomprom excluding subsidiaries and joint enterprises in 2010 amounted to about 9 thousand tU sales volume of uranium production in monetary terms in 2010 increased by 30% compared with 2009
order book JSC Kazatomprom at the end of 2010 amounted to about $ 17 billion
expected net profit of JSC "Kazatomprom in 2010 will be about 53 billion tenge, which is 24% more than in 2009. Such an increase in revenues due to growth in sales volume of uranium production.
In May 2010 JSC Kazatomprom conducted its first Eurobond issue in the amount of U.S. $ 500 million, for a period of 5 years with a coupon rate of 6.25%. The bonds were issued in accordance with the rules RegS/144A and Kazakhstan legislation. Placement of the bonds was carried out on an organized securities market of the Republic Kazakhstan simultaneously with the start of the Placement in foreign countries. Funds raised from the placement of Eurobonds are for general corporate purposes. The organizers of the issue made by JPMorgan, BNP Paribas SA and Halyk Finance.
In 2010, JSC "Kazatomprom implemented a number of large industrial projects :
- LLP PO Inkai »
· in Suzak district of South Kazakhstan commissioned the circle objects industrial complex and geotechnological field.
· Commissioned Works SAT 1 on site 2 Inkai deposit.
- LLP PO Karatau »
· expanded research and industrial production of uranium by PSV Eindhoven in the field Budenovskoye, plot 2.
- LLP "JV" Rollers »
· increased production capacity at the field Moiynkum, section 2 Tortkuduk.
- LLP PO The Fable-U »
· Commissioned residential complex camp for 245 people in the rural district Baykenzhe, Zhanakorgan District Kyzylorda.
Strategic Objectives JSC Kazatomprom focused on achieving a leading position in the world uranium market, the maximum diversification of the Company through participation in the foreign assets of the nuclear fuel cycle (in the stages of conversion, enrichment, production nuclear fuel, building nuclear power plants), as well as the development and use of scientific and technological potential of the Company to diversify into related high-tech areas.
main strategic objective of the Company is to obtain maximum profit from each extracted in RK kg U at all subsequent stages of the nuclear fuel cycle through the effective and optimal use of mineral resources of Kazakhstan uranium, depending on market conditions market.
Thus, in uranium conversion JSC Kazatomprom and Cameco Corporation are working on implementing a joint project of conversion production. In 2010, a Memorandum of Understanding concerning the development of refinery production in the UMP (a subsidiary of JSC NAC Kazatomprom) and expansion of conversion capacity at the plant Springfields (UK).
In the field of uranium enrichment in 2010 g.mezhdu Rosatom and JSC "Kazatomprom reached agreement on the further development of the project company" OAC "(Center for uranium enrichment) for the alternative option, which involves the Kazakh side in the share capital of the Ural Electrochemical Plant (UEIP g.Novouralsk). Deal on acquisition of shares in OAO "UEIP" is scheduled for 2011
In a segment of nuclear fuel production on Oct. 27, 2010, during an official visit in France the President of Kazakhstan N. Nazarbayev, between JSC Kazatomprom and AREVA signed an agreement on how to implement joint activities in production of fuel assemblies in the UMP. The company, owned 51% Kazatomprom and 49% AREVA, will build a new production line for fuel assemblies based on the project for AREVA plant in Ust-Kamenogorsk. It is planned that the new plant with capacity of 400 tons per year to start operating in 2014.
In 2010, the UMP " completed the process of certification fuel pellets of uranium dioxide on the specification of the company AREVA. Kazatomprom won the right to produce fuel for reactors Design AREVA, used in many countries around the world.
In 2010, the UMP and the Japanese company, Nuclear Fuel Industries Ltd. (NFI) in 2010 implemented a certification uranium dioxide powders , produced by JSC UMP for Japanese nuclear power plant, which will allow the plant to the Ulba to supply nuclear fuel components for the Japanese market.
In addition, in 2010, UMP has successfully completed the certification of production of uranium fuel pellets in the company ChinaJianzhongNuclearFuel (CJNF), which is part of ChinaNationalNuclearCompany (CNNC). So way, launched a major project to supply uranium fuel pellets to China, which will be used to manufacture fuel for the largest China's nuclear power plant owner - the company ChinaGuangdongNuclearPowerCorporation (CGNPC).
JSC Kazatomprom continues to actively develop new areas of its activity :
In the area of the Republic of Kazakhstan in the new high technology industries to produce the maximum output level of preparedness based on rare and rare earth metals :
· between JSC Kazatomprom and the Japanese company Sumitomo Corporation was a joint venture LLP PO «SARECO»;
· in the final stage is a joint venture between JSC Kazatomprom and the Japanese company, Toshiba Corporation.
Over the past year the enterprises of JSC "Kazatomprom" assimilated significant amounts of money. In general for all enterprises investment amount previously estimated at 103 billion tenge in subsidiaries - 36 billion (growth of 28% by 2009)
in 2011-2015. JSC "Kazatomprom plans to implement a number of investment projects worth over 341 billion tenge.

In 2011, Kazakhstan plans to produce 19,600 tonnes of uranium, of which kazatompromovskie is 11 000 tonnes

0 comments:

Post a Comment